Preconstruction

Before any mobilization to site, we partner with you to provide the right plan with the required experience – providing predictable outcomes with high confidence.

During pre-construction phase, our CMs provide constructability and safety-in-design input to the engineering team.  Additionally our CMs develop a Construction Execution Plan including the construction schedule, construction cost estimating and trending, and risk management.

Our CMs, in coordination with our procurement professionals, develop a sourcing strategy to provide the right talent, materials, equipment, and engineered systems at the right time.  Our CMs also develop the construction bid documents that communicate the project objectives and scope to the construction contractors.

Specifics

  • Project Feasibility
  • Preliminary Budget
  • Preliminary Schedule
  • Risk/Hazard Analysis
  • Permitting
  • Vendor Qualification