Chemical Facility Expansion

Plus Group provided Construction Management, Engineering, and Procurement services for a Chemical Facility Expansion Project.

Chemical Facility Expansion

The project included the modification of an existing storage area into a new packaging and loading dock area. A new semi-automatic drum filler, a conveyor system, and a clean space were installed for the packaging area.

In addition, an existing loading dock area was converted into a new bulk loading/unloading station which included a new canopy section. An existing lab and locker room area were demolished and new elevated lab constructed.

The bulk of the project consisted of converting an existing warehouse space into a new production area. This included the installation of a new reactor, filter feed tank, three blenders, and other support vessels/equipment.

Value Provided:

  • Design Build Plus was able to provide our client with a turnkey solution for their project execution. The client wanted to perform the project with a design build open book approach that would allow for all subcontracts to be competitively bid, provide the client with final approval for contractors / vendor, and allow the
    project to be fast tracked with minimal amount of design requirements.
  • Having Design Build Plus on site during design allowed for us in conjunction with our sister company Process Plus to implement unique ideas and solutions.

 