An industrial adhesives manufacturer wanted to retrofit an existing chemical storage area to a clean controlled process and packaging room. The client needed to add production capacity without constructing a new facility. The 2500 sq. ft. space required a complete renovation to meet cGMP design requirements and make room for new automated packaging equipment. Our process and design build team provided all engineering and construction management services through close out. All mechanical utilities were relocated and a standalone HVAC system was installed for proper circulation. Insulated metal wall panels and resinous concrete flooring were installed for moisture and chemical resistance. The modern clean room provides the additional capacity needed to meet demand, while ensuring regulatory compliance. Our team delivered a successful project that will continue to benefit our client’s operations for years to come.
LOCATION: OH
TOTAL PROJECT CAPITAL: $5,000,000
Value Provided:
- Design Builds’ experience and flexibility to execute projects with multifaceted variables such as scope, definition, project cost, and scheduling.
Request Project Information
For more information about this project or any other project from Plus Groups, please contact us using the form below.