This project included the demolition of the ceiling, light fixtures, and wash
bay. A mold contractor vaporized hydrogen peroxide into the space to kill mold spores. The wash bay, ceiling, and light fixtures were replaced with new material.

This project was constructed in an existing facility adjacent to active packaging lines where the risk to contamination was high. The project time line required the scheduling of work through the weekend and off shift in order to meet the client completion date.