Process Plus provided process engineering, equipment & piping design, instrumentation & controls design, electrical, mechanical & structural engineering as well as project controls & scheduling for the relocation of a Fluid Bed Reactor System from one state to another.
System Includes:
Relocated:
- Fluid Bed Reactor System
- Super Sack unloading system
- Product storage bins
New construction:
- Rail unloading system
- Product conveying lines
- Associated utilities including steam, electric, plant air, process sewers, natural gas and city water