Plus Group provided Engineering, Automation, Procurement and Installation Services of the existing piping network for MOD 107 & MOD 108 production skids and associated equipment for a Major Personal Care Manufacturer.

Plus Group determined the piping network would require the installation of a mix-proof valve bank. The valve bank was comprised of new valves and valves that were already installed in the area but needed to be repurposed. The proposal included the design and installation of the intermediate Valve Bank. Plus Group provided the client with a team that had significant experience working on the client’s projects to perform all aspects of this project including Engineering, Automation, and Construction of the systems.

System Includes:

  • Process Engineering
  • Process Design
  • Structural
  • Automation/Controls/Hardware/Startup