LR pixel

Our Story, One Project at a Time

Plus Group’s focus is not only on providing our clients with successful solutions to their problems, but also providing them with a success story that they can tell over and over. These success stories as a whole make up the story of Plus Group. Check out some of our favorite stories below.

Filter by Company

Filter by Industry

Project Example

Solids Processing, Encapsulation & Packaging for Major Pharmaceutical Manufacturer

Elements of the design included provisions for the powder micronization, conditioning, milling, blending, capsule filling, blister packaging, case packing, and palletizing of a lactose/level3 compound […]

View Project Example

Project Example

Manufacturing Process Upgrades

Plus Group completed the Conceptual, Definition, Detail Design, Procurement, Automation, Construction Management, Commissioning, Qualification and Validation for the expansion of existing manufacturing plants. The project […]

View Project Example

Project Example

Pharmaceutical Shell Space Build Out

Plus Group provided Construction Management at risk services for the fit of an existing pharmaceutical shell space inside of an existing facility. The project consisted […]

View Project Example

Project Example

Fette Tablet Press

Plus Group provided all engineering and architectural services required to renovate an existing encapsulation suite area into an expanded tablet production suite with controlled airlock […]

View Project Example

Project Example

Pharmaceutical Mold Decontamination

This project included the demolition of the ceiling, light fixtures, and wash bay. A mold contractor vaporized hydrogen peroxide into the space to kill mold […]

View Project Example

Project Example

Pallet Exchange & Cleaning System

Process Plus worked closely with the owner and a material handling equipment manufacturer to develop a fully automated system for the exchange of finished goods […]

View Project Example

Project Example

Secondary Packaging Pharmaceutical Facility Upgrade

The project included the demolition of the existing interior finishes, installation of a new HVAC system including a new AHU, extension of compressed air line […]

View Project Example

Project Example

Solids Processing Packaging with New Facility

Plus Group provided all engineering and architectural services to complete the transformation of an existing high bay warehouse area into a three story, 94,000 square […]

View Project Example