Our Story, One Project at a Time

Plus Group’s focus is not only on providing our clients with successful solutions to their problems, but also providing them with a success story that they can tell over and over. These success stories as a whole make up the story of Plus Group. Check out some of our favorite stories below.

Filter by Company

Filter by Industry

Project Example

Pigment Development and Production Facility

Process Plus completed architectural and engineering services necessary to determine and document conceptual programming data for a new Hazardous Materials Storage Building at a chemical […]

View Project Example

Project Example

Flammable Products Warehouse

Process Plus completed architectural and engineering services necessary to determine and document conceptual programming data for a new Hazardous Materials Storage Building at a chemical […]

View Project Example

Project Example

Dust Hazard Analysis

Plus Group’s Process Plus completed a comprehensive Dust Hazards Analysis including Hazardous Area Electrical Classification Drawing and Rationales for a global Chemical Company. The customer […]

View Project Example

Project Example

Think Tank Renovation

Plus Group provided three-in-one solutions, Definition, Detailed Design and Construction Support, to renovating the conference room and Interactive lab for Multinational Manufacturer of Consumer Products. […]

View Project Example

Project Example

Cellulosic Ethanol Pilot Plant

Plus Group provided the Definition Engineering, Full Detail Design, Construction, Commissioning, Automation and Procurement for a demonstration plant processing wood chips into Cellulosic Fuel Ethanol […]

View Project Example

Project Example

Chemical Facility Expansion

The project included the modification of an existing storage area into a new packaging and loading dock area. A new semi-automatic drum filler, a conveyor […]

View Project Example

Project Example

Chemical Process Scale Up

The project included the renovation of an existing building to accommodate a new production suite and the installation of an outdoor tank farm. Due to […]

View Project Example

Project Example

3 Year Site Master Plan

Process Plus provided 3 Year Site Master Planning services for a biomass solvent extraction facility that produces two fermentable strains of microalgae which produce oils […]

View Project Example

Project Example

Chemical Wastewater Project

Plus Group provided electrical, instrumentation & controls, and automation services to install a vendor engineered and supplied wastewater pretreatment system. Facility expanded process areas which […]

View Project Example

Project Example

DPD Process Modifications

The skid blends multiple raw materials and has a specialized s-curve as well as a remote operations panel, and a scraped wall exchanger. Process Plus […]

View Project Example