Project Example

Aseptic Vial Filling Line

The area and filling operations were having major FDA issues and required a fast track renovation to continue production with a minimum of downtime. Primary focus […]

View Project Example

Project Example

Design & Construction for New Animal Feed Plant

The new plant is a buildout at the client’s existing site and was designed to allow partial production to incrementally increase to the ultimate facility […]

View Project Example

Project Example

Automation Support, Troubleshooting and Optimization

Automation Plus provided ongoing automation services to support operation reliability, troubleshooting services, and support optimization opportunities within a chemical production facility. Focused on Rockwell and […]

View Project Example

Project Example

Naphthalene Plant Installation Project

The project included the demolition of existing facilities, installation of new tank farms, process buildings, pipe rack expansion, distillation towers and a new electrical building. […]

View Project Example

Project Example

Cellulosic Ethanol Pilot Plant

Plus Group provided the Definition Engineering, Full Detail Design, Construction, Commissioning, Automation and Procurement for a demonstration plant processing wood chips into Cellulosic Fuel Ethanol […]

View Project Example

Project Example

Fette Tablet Press

Plus Group provided all engineering and architectural services required to renovate an existing encapsulation suite area into an expanded tablet production suite with controlled airlock […]

View Project Example

Project Example

Chemical Facility Expansion

The project included the modification of an existing storage area into a new packaging and loading dock area. A new semi-automatic drum filler, a conveyor […]

View Project Example

Project Example

Chemical Process Scale Up

The project included the renovation of an existing building to accommodate a new production suite and the installation of an outdoor tank farm. Due to […]

View Project Example

Project Example

3 Year Site Master Plan

Process Plus provided 3 Year Site Master Planning services for a biomass solvent extraction facility that produces two fermentable strains of microalgae which produce oils […]

View Project Example

Project Example

Pharmaceutical Facility Renovation & Expansion

This facility is designed to better accommodate the development of pharmaceutical products. Key project challenges included raising the roof of an existing structure approximately 15 […]